Ongoing Projects

MAA INFRATECH

Electrical Utility Projects

S.No Client Name of Work Authority Location
1 Ram Kripal Singh Construction Pvt. Ltd Electrical Utility Shifting (Up to 33 KV) On NH-80 Mirzachauki To Farakka NHAI PIU - SAHIBGANJ Jharkhand
2 Ram Kripal Singh Construction Pvt. Ltd. Electrical Utility Shifting (Up to 33 KV) on NH122B Hazipur- bachwara NH Division - Patna Bihar
3 Ram Kripal Singh Construction Pvt. Ltd. Electrical Utility Shifting (Up to 33 KV) On NH-75 Chaibasa NH Division - Ranchi Jharkhand
4 Dilip Buildcon Limited. (DBL) Electrical Utility Shifting (Up to 132 KV) On New Link NH-133B from km 0.200 to 15.885 including Ganga Bridge and Construction of Manihari Bypass from km 0.000 to 5.500 and widening of NH-131 A from km 5.500 to 6.000 NHAI PIUSAHIBGANJ Jharkhand
5 RKD Construction Private Limited Electrical Utility Shifting (Gumla Division – New Bharno Thana to Gumla near Karamdeepa PHED Plant) in NH- 23 from Km 26.000 to Km 89.170. NHAI PIURANCHI Jharkhand
6 KCC Buildcon Pvt. Ltd Electrical Utility Shifting from Barasat to Krishna Nagar Section of NH-34 from Km 48+553 to Km 115+272 NHAI PIUKRISHNA NAGAR West Bengal
7 TATA Project Limited Electrical Utility Shifting in NH-709 Garhmukateshwar Ch: 83+200 of NH-24 to Meerut Ch: 9+860 of NH-119 packege XII in the state of Uttar Pradesh on EPC mode. NHAI PIUMeerut Utter Pradesh
8 PNC Infratech Limited Electrical Utility Shifting of 11 KV, 33 KV and L.T. Line crossing at km. 11+500 Meerut To km. 39+240(Design chainage 39+250) and from km. 86+590(Design Chainage 79+500 Bijnor) to Km. 112+545(Design Chainage 105+700 Jalalabad) NHAI PIUMeerut Utter Pradesh
9 Welspun Enterprises Limited Electrical Utility Shifting Up to 33 KV Line from Ch. 934+000 to Ch. 978+400 (Under Aurangabad Division) NHAI PIUSasaram Bihar
10 GR Infra Project Limited Electrical Utility Shifting Up to 33 KV Line from Ch. 0+000 to Ch. 49+000 (Galgaliya to Bahadurganj Package - 1) NHAI PIUPurnia Bihar
11 VRC Construction (India) Pvt. Ltd. Electrical Lines Shifting at our “Six Lanning of Aurangabad to Bihar Jharkhand Border Section of NH-02 from Km 209.827 to Km 249.525 in the state of Bihar under NHDP Phase V on EPC Mode” Project. NHAI PIUSasaram Bihar
12 Soma Indus Varanasi Aurangabad Tollway Private Limited Electrical Shifting work in District Kaimur Six lanning of Varanasi – Aurangabad Section of NH-02 from Km 786.000 to Km 978.400 in the State of UP/Bihar on Design, Build, Finance, Operate and Transfer (The ‘DBFOT’) Toll Basis under Phase-V: NHAI PIU - Sasaram Bihar
13 IRB Hapur Moradabad Tollway Limited Electrical Utility Shifting Hapur Bypass to Moradabad Section Including Hapur bypass from Km 86+570 to Km 95+000 of NH-24 (New NH-9) in the state of Uttar Pradesh on DBFOT (Toll) under NHDP Phase-V (BharatmalaPariyojna) NHAI PIU - Moradabad Utter Pradesh
14 APCO INFRATECH PVT LTD Electrical Utility Shifting on Jewar International Airport Project NHAI PIUMeerut Utter Pradesh
15 POWER AND INSTRUMENTATION GUJRAT LIMITED Power Sub Station 33/11 Kv BSPTCL Bihar

Water Pipeline Projects

S.No Client Name of Work Authority Location
1 Ram Kripal Singh Construction Pvt. Ltd. Water Pipeline Shifting On NH-80 Mirzachouki to Farakka NHAI PIU - SAHIBGANJ Jharkhand
2 Ram Kripal Singh Construction Pvt. Ltd. Water Pipeline shifting on NH-75 at Chaibasa NH Division - Ranchi Jharkhand
3 Dilip Buildcon Limited. (DBL) Water Pipeline Shifting on NH-131 A from Narenpur to Purnea NHAI PIU - Purnea Bihar
4 Ram Kripal Singh Construction Pvt. Ltd. Water Pipeline Shifting on NH-122B Hazipur - bachwara NH Divison - Patna Bihar
5 VRC Construction (India) Pvt. Ltd. PHED Pipeline Shifting at our “Six Laning of Aurangabad to Bihar Jharkhand Border Section of NH-02 from Km 209.827 to Km 249.525 in the state of Bihar under NHDP Phase V on EPC Mode” Project. NHAI PIUSasaram Bihar

Tree Cutting Projects

S.No Client Name of Work Authority Location
1 Ram Kripal Singh Construction Pvt. Ltd. 4 laning of NH -80 from design km. 215.000 to km. 257.718 (existing km. 215.000 to km. 260.000) in the section from Mirzachauki to Farakka in the state of Jharkhnad (Package –I). NHAI PIU - Sahibganj Sahibganj
2 Reliance Infrastructure. Tree Cutting, Transporting, Deposite in the depot of Forest Department for 6 laning of Bihar-Jharkhand Border ( Chordaha) to Gorhar Section of NH -02 from km. 249.525 to km. 320.810 in the State of Jharkhand under NHDP Phase-V on EPC Mode NHAI PIU - Hazaribagh Jharkhand
3 Ram Kripal Singh Construction Pvt. Ltd Tree Cutting, Transporting , Deposite in the depot of Forest Department for NH-122B at Hazipur - Bachwara Section NH Divison - Patna Bihar
4 VRC Construction (India) Pvt. Ltd. Tree Cutting at our “Six Laning of Aurangabad to Bihar Jharkhand Border Section of NH-02 from Km 209.827 to Km 249.525 in the state of Bihar under NHDP Phase V on EPC Mode” Project NHAI PIU - Sasaram Bihar
5 Barbrik Project Ltd Tree Cutting at our “Six Laning of Aurangabad to Bihar Jharkhand Border Section of NH-02 from Km 180.000 to Km 208.927 in the state of Bihar under NHDP Phase V on EPC Mode” Project NHAI PIU - Sasaram Bihar

Government Building & Temple Projects

S.No Client Name of Work Authority Location
1 Ram Kripal Singh Construction Pvt. Ltd. Devlopment of Newly Declaired NH-527C from Majhauli to Choraut section to 2 Lane with paved shoulder National Highway Standerd in the state of Bihar on EPC Mode (Km 0.000 to 63.655). Sitamadhi NHAI PIU - Darbhanga Bihar
2 Ram Kripal Singh Construction Pvt. Ltd. Upgradation to 2 Lane with paved shoulder work of NH-122B from Hazipur to Bachwara via Mahnar and mohiddinnagar from Ch.29+730 to Ch. 72+348 in the State of Bihar through Epc Contract. NH Divison - Patna Bihar
3 Ram Kripal Singh Construction Pvt. Ltd. Devlopment of Newly Declaired NH-527C from Majhauli to Choraut section to 2 Lane with paved shoulder National Highway Standerd in the state of Bihar on EPC Mode (Km 0.000 to 63.655). Madhubani NHAI PIU - Darbhanga Bihar
4 Ram Kripal Singh Construction Pvt. Ltd. Devlopment of Newly Declaired NH-527C from Majhauli to Choraut section to 2 Lane with paved shoulder National Highway Standerd in the state of Bihar on EPC Mode (Km 0.000 to 63.655). Muzaffarpur NHAI PIU - Darbhanga Bihar
5 G R INFRAPROJECTS LIMITED Four Laning of Araria-Galgalia section of NH327E from Km 0.000 to Km 49.000 i.e. (Package-I) and from Km 49.000 to Km 93.000 i.e. (Package-II) on Hybride annuity mode in the state of Bihar” Construction of CPR (Common Property Resources) Structuresat our ARGA Road Project. NHAI PIU PURNIA Bihar
6 GAMMON ENGINEERS AND CONTRACTORS PVT. LTD. Two lanning of Mahesh Kunth-Saharsha-Purnea Section of NH-107 from Km 90.000 to Km 177.960 in the state of Bihar on EPC mode Package II NHAI PIU - Purnea Purnea

Civil Work & Road Maintenance Projects

S.No Client Name of Work Authority Location
1 Ram Kripal Singh Construction Pvt. Ltd Construction of underpass (VUP/PUP) and earth filling in the approach at chainage 18+600 and other Civil works like drain, breast wall on section of NH-31 Barahi- Koderma NHAI PIUHazaribagh Jharkhand
2 Reliance Infrastructure Ltd. Fencing work for base-cap and construction of retaining wall & rigid pavement section 249.525 to 320.810 of NH-02 in the state of Jharkhand. NHAI PIUHazaribagh Jharkhand
3 M/s Anand Construction Repair and maintenance of Mahgama-Hasdiha section of NH-133 from Km 21+500 to 51+800 in the state of Jharkhand. NHAI PIURanchi Jharkhand

Gas Pipeline Project

S.No Client Name of Work Authority Location
1 Corrtech International Pvt. Ltd. Auger Boring in Soft and Hard Soil GAIL Orissa